recoat in 1-4 hours

Sherwin Williams Multi-Purpose latex primer notes that at 77 deg. F and 50% relative humidity my coated panels should dry to the touch in 30 minutes, ready to recoat in 1-4 hours. Now, when did I start painting? In the Grainchek app I will be able to look back through my daily feed of events and check when I started the different phases of work for the day. I’ll also be able to share the progress with the Sherwin Williams team and get project specific tips.

These shaker type stile and rail flat panels will be going in around a jet tub as a skirt surround. They need to be prepped to handle some moisture so I’m priming them on all edges to better seal the wood to minimize absorption and prolong the life of the wood and painted finish.